The space is dual-purpose, including office and laboratory capabilities.
The 1st floor intake lab is equipped to receive and process over 3,000 heart monitors each day. Achieving this sensitive task while meeting state and federal regulations requires a humidity-controlled environment, static dissipating materials across all surfaces, and a private shipping and receiving dock.
The fourth-floor office space is highly detailed, with multiple ceiling and floor finishes throughout differentiating open office, collaboration, and break spaces. A custom light fixture in the break room required 328 mounting points coordinated within a quarter inch.
The space is dual-purpose, including office and laboratory capabilities.
PM: Chris Evans
Assistant PM: Madison Meredith
Project Engineer: Jacob Straw
Superintendent: Jorge Toro
Preconstruction: